Removal of existing chiller and acoustic enclosure, modifications to chilled water pipework and installation of new variable speed air cooled screw chiller
Metromec were employed to dismantle an existing redundant chiller enclosure and to remove the enclosure and chiller from the roof. They also were commissioned to carry out various modifications and additions to the existing chilled water circulation pipework and to install a new chiller in place of the redundant chiller. All works were to be undertaken with minimal disruption to the cooling systems, primary and secondary circulation circuits within the hospital to ensure minimal disruption to services within this busy central London hopsital.