New Chiller Installation at Hospital

New Chiller Installation at Hospital
Brief

Removal of existing redundant chiller unit which had come to the end of its economic life from an existing enclosure on the hospital roof  and crane lift and install a new chiller unit and reconnect all pipework and power.

 

Solution

The existing enclosure panelling was dismantled and removed and craned into a waiting waste management truck on site. The new replacement chiller was then lifted on to the roof and into its final location ready for re-connection and testing.

Outcome

Over the next 2 or 3 weeks we will be reconnecting the power, pipework and controls to the new Chiller and commissioning, prior to final completion.

Site Location
Chelsea and Westminster Hospital, Fulham Road, London
Project Type